Customization: | Available |
---|---|
After-sales Service: | Video Guide or Installation Instruction |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 21.5/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Height | 1m,1.1m,1.2m,1.5m |
Width | 2m,2.2m,2.5m |
Frame tube | 20mmOD, 25mmOD,32mmOD,38mmOD,42mmOD |
Thickness:1.2mm,1.5mm,2.0mm,2.5mm | |
Inner tube | 12mmOD, 16mmOD, 20mmOD, 25mmOD |
Thickness:0.8mm,1.0mm,1.2mm,1.5mm | |
Spacing | 60mm,100mm,120mm,150mm,200mm, |
Accessories | Signboard, Hooks, Lugs |
Feet | Fixed base,Flat base,Bridge base |
Material | Galvanized steel tube |
Surface treatment | Hot dipped galvanized, powder coated,PVC coated |
Color | Silver, yellow, green, red, orange,black, etc |
Note: Our crowd control barrier can be customized according to your required |
Security and Safety
Traffic & Pedestrian Control
Special Events
Concerts
Stadiums/Arenas/Convention Centers
Fairs/Carnivals/Festivals
Parades/Rallies
1- Cutting short the material tube & drilling holes
2- Bending the tube
3- Welding
4- Polishing
5- Hot dipped galvanizing or powder coating
6- Packing
1. Are you a trader or manufacturer?
We are the professional manufacturer. Welcome to visit us!
2. When can I get the price?
Please contact me firstly and then we usually quote within 12 hours after get your inquiry.
3. Can you do the design for us?
Yes. We have a professional team with rich experience in packaging box design and
manufacturing.
4. How do I install the structure or is your company to help us install it?
It is easy to install. We send install video or manual to you. Or welcome visiting our factory. We
will guide you how to install it in our factory.
5. How about the payment?
T/T,L/C 30% T/T advance and the balance against the copy of B/L.